Now that you have finished reviewing all course material, it’s time to take the final exam. You must score 70% or higher to pass this exam. You will have an unlimited number of attempts to pass and there is no time limit for each attempt. Once you pass, you will receive a certificate of completion. Good luck!
0 of 20 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 20 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
You must score 70% or higher to pass this exam. You get unlimited attempts to pass. Please review the course material and attempt this exam again. Once you pass, you will receive a certificate of completion. Click the Restart Quiz button to take this quiz again.
Congratulations – You Passed the Course Exam. Click the “Continue” button to view your certificate of completion.
Which of the following are the individuals responsible for managing project processes and applying knowledge, skills, tools and techniques to complete project activities?
What are the two processes in the initiating process group?
What is the process of identifying the people, groups or organizations that may impact or are impacted by the project?
The communication cabling systems found in commercial and industrial buildings are planned and organized to support different communications systems and are designed to support an average life cycle of ___ years.
A distributor room can be sized to serve equipment outlets or usable floor space, when the number of equipment outlets is unknown. One distributor room is designed to serve up to ______ of usable floor space.
The temperature of an Equipment Room must stay within what operating range?
Industry cabling standards require what grade of plywood to be used for DR backboards?
When performing core drilling in a telecommunications room, all core holes should be placed on the right side of the room.
What size conduit is used for sleeves between vertically aligned distributor rooms?
The maximum fill for a conduit is based on the internal conduit size and the outside diameter of the cables to be installed in the conduit. The total capacity of a conduit is reduced by _____ for each 90 degree bend in the conduit run.
What is the minimum size slot that should be installed in a distributor room that serves a usable floor space of 25,001 to 50,000 sq. m (250,001 to 500,000 sq. ft.)?
What is the maximum distance supported for multimode fiber cable in the backbone subsystem from the MC to IC?
The size of the intrabuilding backbone cables to install in a building will depend on the type of applications that must be supported inside of a building and the location of the network equipment inside of a building.
Industry standards recommend installed a pull box for each _____ of conduit.
The minimum bend radius of a conduit that has an internal diameter of more than 50 mm (2 in.) is ______ times the internal diameter of the conduit.
Local building codes typically specify minimum cable supports at ______ to _______ intervals along the entire cable run.
Industry cabling standards require that all cables installed in the horizontal cabling subsystem be installed in a _______ topology.
The first step for creating an action plan is to perform which planning activity?
Which of the following is the process of performing the work defined in the project plan to achieve the project’s deliverables?
For an IT cabling infrastructure project, closing the project includes all of the following activities except: